The automatic reset GEJ25-3 two-stage deviation switch is a device specifically designed to detect and correct conveyor belt deviation. It has automatic reset and two-level adjustment functions. Here are some detailed information about this product:
function:
application area:
Technical features:
Installation and maintenance:
Operating principle:
If more detailed technical information or product manuals are needed, it is recommended to contact the supplier or manufacturer of the product for the latest information.
1. What is the main function of the automatic reset GEJ25-3 two-stage deviation switch?
The main function of the automatic reset GEJ25-3 two-stage deviation switch is to detect the deviation of the conveyor belt. When the conveyor belt deviates, the switch will send a signal and automatically adjust to restore the normal position of the conveyor belt. It has a two-level adjustment function, with different levels of intervention based on the degree of deviation.
2. What industrial fields is the automatic reset GEJ25-3 two-stage deviation switch suitable for?
The automatic reset GEJ25-3 two-stage deviation switch is widely used in industrial conveying systems such as mines, steel plants, power plants, ports, and chemical plants. It is particularly suitable for places that require long-term continuous operation and harsh environmental conditions.
3. What are the technical features of the automatic reset GEJ25-3 two-stage deviation switch?
The automatic reset GEJ25-3 two-stage deviation switch has high sensitivity and precise detection capability, and is designed to be sturdy and durable, capable of stable operation in harsh industrial environments. It also has dust-proof function and two-level adjustment function, which can intervene at different levels according to the degree of deviation.
4. How to install the automatic reset GEJ25-3 two-stage deviation switch?
Installing the automatic reset GEJ25-3 two-stage deviation switch is relatively simple, usually requiring it to be fixed on the brackets on both sides of the conveyor belt and connected to the corresponding control system. The specific installation method can refer to the product's installation manual or consult the supplier.
5. What are the maintenance requirements for the automatic reset GEJ25-3 two-stage deviation switch?
The maintenance requirements for the automatic reset GEJ25-3 two-stage deviation switch are relatively simple. Due to its sturdy design, components are easy to replace and maintain. Regularly check the operation of the switch, clean its surface and sensors to ensure their normal functioning. The specific maintenance steps can refer to the product's maintenance manual.